
| No. | Item | Quantity | Remark |
| Milling unit | |||
| 1 | Malt mill | 1 | Double/four roller, with grist hopper, hydrator |
| Brew house unit | |||
| 1 | Mash | 1 | Stainless steel |
| Tank | Volume: 100L-5000 | ||
| With agitator | |||
| 2 | Lauter | 1 | Stainless steel |
| Tank | Volume: 100L-5000 | ||
| With agitator | |||
| 3 | Kettle/Whirlpool | 1 | Stainless steel |
| Volume: 100L-5000 | |||
| Steam/electric heating | |||
| 4 | Hot water tank | Stainless steel | |
| 1 | Steam/electric heating | ||
| 5 | Wort Pump | 2 | Stainless steel |
| 6 | 1 | Stainless steel | |
| Hot water pump | |||
| 7 | Heat Exchanger | 1 | Stainless steel |
| Double stage/single stage | |||
| 8 | Mashing Pipes | Assorted | Stainless steel |
| 9 | Working platform | 1 | Stainless steel |
| Fermentation unit | |||
| 1 | Fermenters | Follow customers requirement | Stainless steel |
| Volume: 100L-10000L | |||
| Dimple plate cooling jacket | |||
| 2 | Bright beer tanks | Stainless steel | |
| Dimple plate cooling jacket | |||
| Conical/domed bottom | |||
| 3 | Yeast Tank | 1 | Stainless steel, |
| 4 | Beer Pipes | 1 set | Sanitary tube, Plastic. |
| 5 | Coolant Pipes | assorted | Stainless steel |
| 6 | Insulation Pipes | assorted | Polyurethane |
| Cooling unit | |||
| 1 | Ice Liquor Tank | Assorted | SUS 304 Stainless steel |
| Double layers, polyurethane | |||
| Capacity being confirmed as actual cool requirement | |||
| 2 | Chiller | Assembly unit | |
| 3 | Ice Liquor Pump | Stainless steel | |
| 4 | Pipes & Valves | assorted | Stainless steel |
| CIP unit | |||
| 1 | CIP unit | 1 plant | 100L -500L |
| Stainless steel | |||
| Include alkali, acid, sterilize hot water tank etc. | |||
| Control unit | |||
| 1 | Control Cabinet | 1 | Stainless steel |
| With power control | |||
| 2 | 1 | PLC control | |
| Touch Screen | |||
| Service item | |||
| 1. Brewery instruction | |||
| 1) This is the whole brewing plant, filling unit proposal being offered separately | |||
| 2) We can handle the transportation to destination port | |||
| 3) The warranty time is 12 months, | |||
| 4) If customer needs, we can appoint our engineer for the installation. | |||
| 2. Installation instruction: | |||
| 1) Electrical parts fit the local power requirement. | |||
| 2) Ice water tank contains mixed liquid of glycol and water. Chiller being installed outside of the house to avoid any noisy problem. | |||